Aalborg TIO Totalizer I/O Flow Monitor/Controller Manual de usuario Pagina 53

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 98
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 52
49
6. INSTALLATION
6.1 General Directions
Mounting, electrical installations, parameters configuration, start up, and
maintenance of this instrument may only be performed by trained personnel.
Personnel must read and understand this operating manual before performing
any installation or configuration steps.
The TIO device should only be operated by trained personnel. All instructions in
this manual are to be observed.
Ensure that power and all input / output signals are correctly wired
according to the wiring diagram provided in this manual. The housing of the
device should only be opened by trained personnel.
6.2 Hardware Installation
NOTE: Electrostatic discharge may cause permanent damage to the
electronic circuitry. Before installing or connecting any wires, the
installer must discharge himself by touching the building protective
earth ground.
,
The TIO Totalizer Input / Output Flow monitor / Controller can be attached
(mounted) to the Aalborg7 GFM series flow meters, GFC series controllers or
used stand alone (panel mounted or table top installation).
Vista de pagina 52
1 2 ... 48 49 50 51 52 53 54 55 56 57 58 ... 97 98

Comentarios a estos manuales

Sin comentarios